Notícias

P-240TT

08-09-15

Warning: A non-numeric value encountered in /home/llamadabrasil/www/site/wp-content/plugins/new-royalslider/classes/rsgenerator/NewRoyalSliderGenerator.php on line 339

The P240TT, the star in the Scandinavian TRIPLA-PROJECT in Helsinki.
Piling to 28 meters with CFA in very hard soils while drilling in rock soils through Down the hole hammer (DTH), reaching very high productivity.


Compartilhe